|
Issue |
Title |
|
Vol 3, No 2 (2014): Mei 2014 |
PERHITUNGAN STRUKTUR BETON GEDUNG SEKOLAH DASAR MUHAMMADIYAH METRO PUSAT (KAMPUS 2) |
Abstract
PDF (Bahasa Indonesia)
|
- Masherni |
|
Vol 2, No 2 (2013): Mei 2013 |
PERHITUNGAN SURVEY PARKIR BANK BCA (RUKO) DI BANDAR LAMPUNG |
Abstract
PDF (Bahasa Indonesia)
|
Angga Gustian |
|
Vol 14, No 1 (2024): November 2024 |
PERKEMBANGAN PENERAPAN BIM PADA PROYEK STRATEGIS NASIONAL BENDUNGAN DI INDONESIA OLEH PT WASKITA KARYA (PERSERO) TBK |
Abstract
PDF
PDF
PDF
|
Fitriana Sarifah, Rayza Fitri Radena, Destira Ghaida Hasna, Devi Desmayanti, Rangga Arya Purnama, Gina Kania |
|
Vol 8, No 1 (2018): November 2018 |
PERUBAHAN PARAMETER MARSHALL AKIBAT PERBEDAAN JUMLAH TUMBUKAN PADA ASPHALT CONCRETE-BINDER COARSE (AC-BC) GRADASI KASAR |
Abstract
PDF
|
Leni Sriharyani, Ahmad Tholib |
|
Vol 14, No 1 (2024): November 2024 |
PERUBAHAN PERILAKU SIFAT MEKANIS BETON MUTU TINGGI AKIBAT PENGGUNAAN ABU CANGKANG KERANG SEBAGAI PENGGANTI ABU TERBANG MENGACU SNI 03- 6468-2000 |
Abstract
PDF
|
Yusuf Amran, Ilham Tri Anggoro |
|
211 - 215 of 234 Items |
<< < 41 42 43 44 45 > >> |